Top
 
Cordova Electric Cooperative

Crater Lake

Cordova Electric Cooperative and the City of Cordova hired a firm to evaluate the feasibility of the Crater Lake Water and Power Project and develop a Feasibility/Conceptual Design Report for the Project.  The Feasibility Study has been completed and is available to review.  The Crater Lake Feasibility Study Executive Summary and Conclusions can be viewed here.  You can also view the complete Crater Lake Feasibility Study.  Due to the large file size we cannot put the complete Study on our webpage, however, you can stop by the CEC office at 705 Second Street to review it.

Chief Executive Officer Clay Koplin, along with Kelly Tilford with McMillan Jacobs Associates, the firm that completed the Feasibility Study, conducted a meeting regarding the project “What is it and what can it do for Cordova”  on Wednesday, June 29, 2016  in the USFS Meeting Room (located on Second Street, 3rd floor). If you missed the meeting and would like more information of this project contact Clay at the CEC office or call him at 907-424-5555.

The Crater Lake Water & Power Project power point presentation shown at the CEC August 2019 Board of Directors meeting is available to read here.  Feel free to contact the office for more information on this project.